Linc Centre, fit out
Location: Bow, London
Working for: Poplar HARCA
Summary of work: We were asked to undertake a complete fit out of the community Linc Centre in Bow. The centre was in need of updating and needed to be warm and more inviting to the local families living in the community. We upgraded the toilets and kitchen facilities along with adding new bright coloured floors and work areas. We also decorated throughout and fitted new modern lighting.
Location: Bow, London
Working for: Poplar HARCA
Summary of work: We were asked to undertake a complete fit out of the community Linc Centre in Bow. The centre was in need of updating and needed to be warm and more inviting to the local families living in the community. We upgraded the toilets and kitchen facilities along with adding new bright coloured floors and work areas. We also decorated throughout and fitted new modern lighting.
Hungry Bedouin, restaurant fit out
Location: Westfield, Stratford
Working for: Westfield
Summary of work: Originally a gin bar it was only using a quarter of the space. As a result, the owners wanted it to become a Moroccan inspired restaurant. The whole area needed re-modelling and we fitted a new kitchenette with new stainless-steel sinks and preparation tables. We built and fitted a new concrete worktop bar and counter. All walls had polished plaster with Moroccan art painted directly on some of the walls. We also created a wooden cladded feature wall and seating made from wooden pallets.
Location: Westfield, Stratford
Working for: Westfield
Summary of work: Originally a gin bar it was only using a quarter of the space. As a result, the owners wanted it to become a Moroccan inspired restaurant. The whole area needed re-modelling and we fitted a new kitchenette with new stainless-steel sinks and preparation tables. We built and fitted a new concrete worktop bar and counter. All walls had polished plaster with Moroccan art painted directly on some of the walls. We also created a wooden cladded feature wall and seating made from wooden pallets.
Full basement refurbishment
Location: Morgan Street
Working for: Residents of the property
Summary of work: We literally hacked everything back! We fully damp treated walls and created a new structural ceiling. Throughout the property we created bespoke carpentry including a new under stairs toilet, a custom stereo hi fi and vinyl unit, new wooden flooring, new toilet room with pocket sliding doors and new wooden sash windows. We redecorated throughout and installed a new data and wi-fi hard wired system throughout the basement and ground floor. We enjoyed the finish look of this one and the owners were great clients to work for.
Location: Morgan Street
Working for: Residents of the property
Summary of work: We literally hacked everything back! We fully damp treated walls and created a new structural ceiling. Throughout the property we created bespoke carpentry including a new under stairs toilet, a custom stereo hi fi and vinyl unit, new wooden flooring, new toilet room with pocket sliding doors and new wooden sash windows. We redecorated throughout and installed a new data and wi-fi hard wired system throughout the basement and ground floor. We enjoyed the finish look of this one and the owners were great clients to work for.
New build
Location: Harold wood Essex
Working for: Residents of the property
Summary of work: Originally a 2-bed bungalow, the clients wanted this property to be made into a 4 bedroomed house. We made a new ground floor with open kitchen/living room, two bathrooms and a downstairs toilet and fitted a timber 1st floor with roof to double the height of this property. Front external walls were insulated and then silicone rendered and underfloor heating and large bifold doors installed. The front and rear garden also had a makeover and were fully landscaped.
Location: Harold wood Essex
Working for: Residents of the property
Summary of work: Originally a 2-bed bungalow, the clients wanted this property to be made into a 4 bedroomed house. We made a new ground floor with open kitchen/living room, two bathrooms and a downstairs toilet and fitted a timber 1st floor with roof to double the height of this property. Front external walls were insulated and then silicone rendered and underfloor heating and large bifold doors installed. The front and rear garden also had a makeover and were fully landscaped.
Hackney PCN centre
Location: 136-142 Lower Clapton Road, Hackney
Working for: Hackney Council
Summary of work: The men’s toilets needed upgrading as the toilet walls were made only with plaster and they were being stained and damaged. As part of the installation, we added new white clinical grade hygienic cladding, which can be chemically cleaned. We also created a bespoke door replacement. All walls were re-plastered and specially sealed plastic edge beads (which is a highly durable product) were added to prolong the lifetime of the walls.
Location: 136-142 Lower Clapton Road, Hackney
Working for: Hackney Council
Summary of work: The men’s toilets needed upgrading as the toilet walls were made only with plaster and they were being stained and damaged. As part of the installation, we added new white clinical grade hygienic cladding, which can be chemically cleaned. We also created a bespoke door replacement. All walls were re-plastered and specially sealed plastic edge beads (which is a highly durable product) were added to prolong the lifetime of the walls.
Curry’s PC World, front of building works
Location: 94-98 Oxford Street
Working for: Curry’s PC World
Summary of work: The front façade of the offices directly above this store had old mosaic tiles, which were damaged, and were causing a safety risk to the public passing below. In order to access this area, we used a sky lift out of hours. We covered the existing damaged mosaic tiles with new, breathable silicone render in a white finish.
Location: 94-98 Oxford Street
Working for: Curry’s PC World
Summary of work: The front façade of the offices directly above this store had old mosaic tiles, which were damaged, and were causing a safety risk to the public passing below. In order to access this area, we used a sky lift out of hours. We covered the existing damaged mosaic tiles with new, breathable silicone render in a white finish.
|
High end luxury flats in Kensington
Location: Lancer Square Kensington
Working for: Edmunds Services Limited
Summary of work: During our time in Kensington, we undertook various jobs including the installation of a security entry system. To ensure that we kept the area clean and dust free, we used a specialist ventilated work tent to ensure no dust was released into the air. This was ideal as this communal area couldn’t be locked off from the public or residents. We also installed a bespoke mail cupboard for the concierge and installed a new electronic entry system by cut through existing tiles.
Location: Lancer Square Kensington
Working for: Edmunds Services Limited
Summary of work: During our time in Kensington, we undertook various jobs including the installation of a security entry system. To ensure that we kept the area clean and dust free, we used a specialist ventilated work tent to ensure no dust was released into the air. This was ideal as this communal area couldn’t be locked off from the public or residents. We also installed a bespoke mail cupboard for the concierge and installed a new electronic entry system by cut through existing tiles.
Hackney Council, commercial roof and lead works
Location: Mare Street, Hackney
Working for: Hackney Council
Summary of work: The lead ridge capping on this building had come loose after some strong winds and was hanging over causing a health and safety issue to the passing public below. In order to replace the lead, we had to gain licences from the Local Authority so that we could get have the pavement closed off and hire a portable Crane Cradle that allowed us to reach the roof which was 18m high.
Location: Mare Street, Hackney
Working for: Hackney Council
Summary of work: The lead ridge capping on this building had come loose after some strong winds and was hanging over causing a health and safety issue to the passing public below. In order to replace the lead, we had to gain licences from the Local Authority so that we could get have the pavement closed off and hire a portable Crane Cradle that allowed us to reach the roof which was 18m high.
Harold Wood, Methodist Church
Location: Harold Wood, Essex
Working for: Methodist Church
Summary of work: Following heavy rains, the church had a large flood due to an inadequate drainage system. We dug up the perimeters to all doors and installed a new deep French drainage system, removed the doorway, blocked in and pebble-dashed the area to match surrounding building walls. The new drainage system included a new larger main drain trap which allowed more water to pass through.
Location: Harold Wood, Essex
Working for: Methodist Church
Summary of work: Following heavy rains, the church had a large flood due to an inadequate drainage system. We dug up the perimeters to all doors and installed a new deep French drainage system, removed the doorway, blocked in and pebble-dashed the area to match surrounding building walls. The new drainage system included a new larger main drain trap which allowed more water to pass through.
Stoke Newington Library, light fitting and new flagpole
Location: Stoke Newington Church Street, North London
Working for: Hackney Council
Summary of work: The lighting system was failing so we had to install new transformers for 20 hanging lights. We also had to erect a safety barrier around a large glass roof light to protect it whilst we fitted a new flag pole as the library is a listed building.
Location: Stoke Newington Church Street, North London
Working for: Hackney Council
Summary of work: The lighting system was failing so we had to install new transformers for 20 hanging lights. We also had to erect a safety barrier around a large glass roof light to protect it whilst we fitted a new flag pole as the library is a listed building.
Leisure Centre, rendering
Location: Balham, South London
Summary of work: The external walls of this leisure centre were blown and damaged and pieces were falling off. We removed existing render back to its sub block layer and installed two new coats of sand and cement water proof render. We then painted all new walls.
Location: Balham, South London
Summary of work: The external walls of this leisure centre were blown and damaged and pieces were falling off. We removed existing render back to its sub block layer and installed two new coats of sand and cement water proof render. We then painted all new walls.
Office fit out - cladding feature walls
Location: 80 Cannon Street
Summary of work: We were required to create cladding feature walls in 6 offices. In addition to this we also installed audio equipment which meant that the walls were fully functioning as working offices.
Location: 80 Cannon Street
Summary of work: We were required to create cladding feature walls in 6 offices. In addition to this we also installed audio equipment which meant that the walls were fully functioning as working offices.
Bathroom refurbishment
Location: Lewisham, South London
Summary of work: The owner of this property was keen to update the look of their bathroom. This modern design required the installation of a new shower area, toilet, vanity unit and bath. New tiles, flooring and radiator were also fitted.
Location: Lewisham, South London
Summary of work: The owner of this property was keen to update the look of their bathroom. This modern design required the installation of a new shower area, toilet, vanity unit and bath. New tiles, flooring and radiator were also fitted.
Garage conversion and single storey extension
Summary of work: This project required us to convert the garage and build an extra level on top. We refurbished the entire house which included the creation of openings, installing steels, fitting windows (with bespoke made timber cladding) fitting out two bathrooms, and installing a new kitchen. Oak finish flooring was also fitted throughout the house.
Summary of work: This project required us to convert the garage and build an extra level on top. We refurbished the entire house which included the creation of openings, installing steels, fitting windows (with bespoke made timber cladding) fitting out two bathrooms, and installing a new kitchen. Oak finish flooring was also fitted throughout the house.
Holton Building Services - professional building maintenance providers
Building Maintenance Essex | Building Maintenance London | Building Maintenance Essex | Building Maintenance Hertfordshire | Building Maintenance Kent
Building Maintenance Essex | Building Maintenance London | Building Maintenance Essex | Building Maintenance Hertfordshire | Building Maintenance Kent